Brand

V&C Contractors

Category

Road Construction

Project Description

V&C Contractors were tasked by Infrastructure Malta to carry out this multi-phase project focused on multiple lane road widening works at Triq Sant Andrija Swieqi. We built retaining walls for the upper part of the road, landscaped the area, installed delta blocks and asphalted the surface.

The project also included modifications to the football pitches in line with the road widening. This included the rebuilding of the pitches’ boundary wall and the shifting services. Finally, temporary asphalt was applied in preparation of the next phase.

Area

3,100 sqm

Duration

13 months

Location

Pembroke